When it comes to delays, should you really blame the metal fabricators?

0


A project begins with the development of 2D fabrication shop drawings; steel shop drawings and are summarized into 3D models to coordinate with Construction Company and metal fabrication. The designer ideally communicates back with the architects to develop appropriate geometry of the staircase, handrail, design the railings, etc., and develop the fabrication drawings, assembly and installation drawings. Find out more at:
Post Response
Login to post your Comments