Basement Bathroom Remodel

6


The client's requirement was to maximize the space available and make it feel open and therefore wanted to relocate their laundry area and add an additional, full bathroom to their unfinished utility space in the basement.


The designers installed all new plumbing lines into the basement and configured the shower so that both the rain-shower head and hand-held could be utilized at the same time.


The homeowner also desired for a very specific mosaic accent tile, which she had seen previously, but only had a picture of it.


After extensive research, the designers were able to track down the accent tile out of state.


The dark natural tones of the mosaic compliments the rest of the lighter wall and the floor tiles, while the dark wood vanity adds a very beautiful contrast to the rest of the space.

Related Services


Related Bath Products

Post Response
Login to post your Comments